單項選擇題A large valve,usually installed above the ram preventers,that forms a seal in the annular space between the pipe and wellbore or,if no pipe is present,on the wellbore itself is called the().

A.annular blowout preventer
B.annulus
C.accumulator
D.automatic choke


您可能感興趣的試卷

你可能感興趣的試題

3.單項選擇題A jack-up drilling unit elevated on the Outer Continental Shelf must have a fog horn that will sound().

A.a 2-second blast every 20 seconds
B.a 4-second blast every 20 seconds
C.an 8-second blast every 30 seconds
D.a 10-second blast every 30 seconds

4.單項選擇題A jack-up drilling rig being towed must().

A.turn off all lights that interfere with the navigation lights
B.turn on all available working lights on deck
C.ring the bell rapidly for five seconds once a minute
D.display two black diamonds in a vertical line during the day

5.單項選擇題A helmsman receives the command “Right 15 degrees rudder.”The helmsman’s IMMEDIATE reply should be().

A.Aye Aye Sir
B.Right 15 degrees rudder
C.Rudder is right 15 degrees
D.No reply is necessary,just carry out the order