A.when
B.which
C.that
D.then
您可能感興趣的試卷
你可能感興趣的試題
A.the estimated cost of damage
B.the name of the owner or agent of the vessel
C.an evaluation of who was at fault
D.the amount of ballast on board
A.Notice of Demurrage
B.Survey Report
C.Notice of Readiness
D.Notice of Responsibility
A.At
B.On
C.Of
D.In
最新試題
Mariners are FIRST warned of serious defects or important changes to aids to navigation by means of().
My Captain is trying to()the pilot station before the ebb tide.
The undersigned()that he is duly authorized by the said Government to issue this certificate.
Lay days()to commence after the expiry of a specified time after the giving of the notice of readiness to load or discharge.
The survey will in no way()cargo operation,but the main engine will require four-hour notice to be ready if necessary after completion of the survey.
The diurnal variation of pressure is most noticeable().
The diurnal pressure variation is most noticeable in the().
The Experimental Lighthouse-buoy has no navigational significance and may be removed at will.The above sentence means().
I undertake to bring to the notice of the Suez Canal Authorities,before my vessel()the Canal,any defects which may appear.
The effect of wind on exposed areas of the vessel is most noticeable when().