A.cargo fill
B.line drop
C.transfer
D.branch line
您可能感興趣的試卷
你可能感興趣的試題
A.the nature of the cargo being carried
B.changes in heading
C.major structural repair
D.All of the above
A.determined by the Master
B.specified by the Coast Guard
C.specified by the manufacturer
D.None
A.in the pumproom
B.at the vent header
C.at the main deck manifold
D.the midships house
A.A declaration is required and duty is involved on the total cost
B.No declaration is required since this is considered routine maintenance
C.A declaration is made and duty is charged on the materials only
D.A declaration is made,but duty is charged on the labor only
A.The tanks lie above the waterline and are filled
B.The tanks are partially filled with dry cargo
C.The tanks are partially filled with liquid cargo
D.The tanks are filled and lie below the waterline
最新試題
Which is a negotiable document? ()
Which is NOT a required entry in the ship’s Official Logbook?()
When loading bulk liquid cargo,what is the first action you should take if a cargo valve jammed open?()
When the dew point of the outside air is lower than or equal to the dew point of the air in the cargo hold,you should().
The required number and type of hand portable fire extinguishers for staterooms on cargo vessels is().
The valve on the discharge side of a cargo pump on a tank vessel will usually be a().
The purpose of inert gas systems aboard tank vessels is to().
Which of the following statements is TRUE regarding lashing requirements to secure vehicles aboard Ro-Ro vessels?()
Which element(s) should be taken into account in the preparation of the “Cargo Securing Manual”?()
Which is an example of cargo damage caused by inherent vice? ()