A.Certificate of Documentation
B.Certificate of Inspection
C.Operators Merchant Marine license
D.FCC Station License
您可能感興趣的試卷
你可能感興趣的試題
A.The reinspection will be made between the fourteenth and sixteenth months
B.The inspector shall examine all accessible parts of the vessels's hull
C.The inspector shall examine the vessel's machinery as well as equipment
D.The scope of the reinspection shall be the same as for the inspection for certification,but in less detail
A.two years
B.one year
C.until the next Coast Guard inspection
D.until the end of the voyage
A.refer to the vessel's Certificate of Inspection
B.examine the cargo tanks and fittings
C.ask the terminal supervisor or his representative
D.check the loading order
A.Certificate of Inspection
B.loading order
C.rules and regulations for tank vessels
D.tankerman's document
A.Fusible links must be replaced if a damper is activated
B.Fusible links are tested by applying a source of heat to them
C.Fusible links must be replaced at every inspection for certification
D.A fusible link will automatically open after a fire is extinguished and reset the damper
最新試題
The master shall be()the marine environment when taking collision-avoiding action.
Acceptance of delivery shall not()any waiver of Charterer’s rights hereunder.
Where would you find a list of the lifesaving equipment onboard your supply boat? ()
All the following are the objectives of ISM code except().
To determine which grades of cargo a tank vessel is permitted to carry you should().
()is responsible for ensuring that adequate resources and shore based support are provided to enable the designated person or persons to carry out their functions.
To determine the pressure and temperature limitations under which LFG is required to be transported on a barge,you should look at the().
If the Charterer nominates an unsafe port and the ship is damaged through going there,() will be liable for the damage,subject to that the master acts reasonably in going there.
Procedures for the implementation of corrective action should be established by().
Who checks the bridge clock for accuracy each day().