A.To cut out generators when they are no longer required
B.To cut in additional generators automatically as required
C.To divide the KW load equally between generators operating in parallel
D.To divide reactive current between generators operating in parallel
您可能感興趣的試卷
你可能感興趣的試題
A.capacitor in series with the load
B.inductor in series with the load
C.capacitor and inductor in series with the load
D.resistor in series with the load
A.the resistor next to the negative terminal
B.a short circuit
C.the resistor next to the positive terminal
D.an open circuit
A.amount of field excitation of the leading machine
B.load-speed characteristics of the governors
C.amount of field excitation to the lagging machine
D.type of alternator
A.voltage regulators
B.field rheostats
C.reverse power relays
D.prime mover governors
A.120°apart
B.160°apart
C.180°apart
D.360°apart
最新試題
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
To proceed to the assistance of a ship in distress is()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
The treatment of the fuel oils involves storage, heating, filtering and()
If separating effect is not good, which measure should be taken ()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
The main purpose of port State control is not to()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()