單項(xiàng)選擇題Current measuring instruments must always be connected in ()

A.series with a circuit
B.parallel with a circuit
C.series-parallel with a circuit
D.delta with the shunt


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題The primary function of an electric motor is to ()

A.develop torque
B.generate high voltages
C.produce a magnetic field
D.generate high electrical resistance

2.單項(xiàng)選擇題The power factor at which a paralleled AC generator operates is usually adjusted by the ().

A.connected load
B.prime mover speed
C.field excitation
D.generators rated voltage

4.單項(xiàng)選擇題Equal power factors on paralleled AC generators are maintained by an automatic ().

A.voltage regulator
B.reverse power relay
C.reverse current relay
D.governor control switch

5.單項(xiàng)選擇題To equalize the power factor of two alternators operating in parallel, the ()

A.field excitation of both units is adjusted
B.governors of both units are adjusted
C.phase sequence is altered
D.kilowatt load is evenly divided

最新試題

For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()

題型:?jiǎn)雾?xiàng)選擇題

Which one is NOT the ‘clear grounds’ for a more detailed inspection?()

題型:?jiǎn)雾?xiàng)選擇題

To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()

題型:?jiǎn)雾?xiàng)選擇題

Flame failure in an automatically fired auxiliary boiler can from a/an ()

題型:?jiǎn)雾?xiàng)選擇題

()connectors hold best if a wire is accidentally pulled or a connection becomes loose.

題型:?jiǎn)雾?xiàng)選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:?jiǎn)雾?xiàng)選擇題

“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()

題型:?jiǎn)雾?xiàng)選擇題

The treatment of the fuel oils involves storage, heating, filtering and()

題型:?jiǎn)雾?xiàng)選擇題

The shipboard oil pollution emergency plan will be invalid after ()

題型:?jiǎn)雾?xiàng)選擇題

Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()

題型:?jiǎn)雾?xiàng)選擇題