A.Certificate of Inspection
B.Load line certificate
C.Certificate of Documentation
D.SOLAS Certificate
您可能感興趣的試卷
你可能感興趣的試題
A.SOLAS Certificate is issued
B.Load Line Certificate is renewed
C.classification society approval is issued
D.permanent Certificate of Inspection is issued
A.bridge
B.engineering control station
C.recreation and messrooms
D.fire control room
A.International Maritime Dangerous Goods Carried by Sea
B.International Code for the Construction and Equipment of Ships Carrying Gases in Bulk
C.International Convention for the Safety of Life at Sea
D.International Regulations for Preventing Collisions at Sea
A.in contrast to
B.in compliance with
C.the essence of
D.representing
A.bailer
B.sponge
C.whistle
D.fishing kit
最新試題
Which of the following statements concerning the rigging of bosuns’ chairs and their use is TRUE().
In a twin screw ship going half-ahead,both screws turning outboard and the rudder amidships,no current or wind,the vessel will().
What best describes an anchor buoy().
When rigging a stage,the standing part should be fastened to the horns of a stage with which of the following hitches().
Serving is().
An intermediate spring is().
The Charterers shall have the privilege to ship dangerous cargo in accordance with()Code or any competent authorities’ regulations,as applicable.
In the manufacture of wire rope,if the wires are shaped to conform to the curvature of the finished rope before they are laid up,the rope is called().
What equipment is customarily used when seamen are working on a stage rigged over the side of a vessel().
Manila lines in which the strands are right-hand laid().