A.week
B.2 weeks
C.month
D.3 months
您可能感興趣的試卷
你可能感興趣的試題
A.De-energize the applicable switchboard bus
B.Bypass the interlocks
C.Secure and tag the supply circuit breaker in the open position
D.Station a man at the circuit supply switch
A.Wear rubber gloves and boots
B.Use only approved non-conducting tools
C.Ground the case of the machine before beginning any repairs
D.Open the supply circuits and tag the switches
A.electromagnetic field, revolving armature type
B.electromagnetic field, oscillatory armature type
C.armature, oscillatory electromagnet field type
D.armature, rotating electromagnetic field type
A.The breaker should be closed when one synchronizing lamp is dark and the other is bright
B.The breaker should be closed when both synchronizing lamps are bright
C.The frequency meter should be used to determine that the incoming alternator frequency is slightly higher than the bus
D.A portable phase sequence indicator must be used to verify the information from the lamps
A.100kw
B.400kw
C.500kw
D.600kw
最新試題
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
The treatment of the fuel oils involves storage, heating, filtering and()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Which of the following items don’t belong to dock repair works?()
Diesel engine air start system check valves are opened by ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()