A.noted by the bridge officer
B.told by last duty engineer
C.observed
D.in the instruction manual
您可能感興趣的試卷
你可能感興趣的試題
A.the chief engineer must be informed at first
B.the captain must be informed at first
C.it must be taken by the duty engineer
D.the generator engine must be stopped
A.captain
B.chief engineer
C.chief officer
D.chief motorman
A.Constant inspection
B.Keeping constant load
C.Remaining constant temperature
D.Varying speed
A.It consumes no excitation power
B.It has current transformers
C.Components are needed for accurate compounding
D.Its excitation system is vulnerable to voltage variations
A.when
B.so as
C.such that
D.though
最新試題
The ISPS Code consists of a mandatory section-Part A, which shows()
Which of the following items don’t belong to dock repair works?()
Diesel engine air start system check valves are opened by ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()