A.oil leakage in engine-room
B.hot work (welding, cutting, etc)
C.static electricity
D.all of the above
您可能感興趣的試卷
你可能感興趣的試題
A.the three elements of fire and explosion
B.lower and upper flammable limits
C.classification of flies and applicable extinguishing agents
D.All of the above
A.use self-contained breathing apparatus
B.use various types of portable fire extinguishers
C.effect a rescue in a smoke-filled space wearing breathing apparatus
D.All of the above
A.served
B.serving
C.surveyed
D.surveying
A.Stop loading
B.Notify the harbour administration
C.Determine if the vessel is the source of the pollution
D.Start the main engine and put them in gear to disperse the spill
A.both;and
B.whether;or
C.neither;nor
D.because;so
最新試題
The cetane rating of diesel fuel is an indication of the ()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Cold weather starting of a diesel engine may be made easier by()
The ISPS Code consists of a mandatory section-Part A, which shows()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
() is not installed on the main switchboar.
The main purpose of port State control is not to()
Under MARPOL Code the ship to which it applies has to carry ()
Which of the following items don’t belong to dock repair works?()