A.list
B.heel
C.trim
D.flotation
您可能感興趣的試卷
你可能感興趣的試題
A.cool the bulkheads around the fire
B.remove combustibles from direct exposure
C.close all openings to the area
D.shut off all electric power
A.engineer on watch
B.Chief Engineer
C.Chief Mate
D.Master
A.all vessels, regardless of size and commercial application
B.any barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboard
C.an oil tanker of 150 gross tons or above, or other ship of 400 gross tons or above
D.an oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above
A.all hands are at their fire stations
B.all fire-fighting equipment is at the scene
C.the fixed systems are activated
D.the fire is contained and no longer spreading
A.one year
B.two years
C.four years
D.five years
最新試題
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()