A.bedding
B.pipe insulation
C.paint
D.a generator
您可能感興趣的試卷
你可能感興趣的試題
A.engine room bilges
B.main switchboard
C.paint locker
D.rag bin
A.only if fixed containment is not used
B.only if portable containment is not used
C.only if fixed containment drains are open
D.whenever the vessel is being bunkered
A.plugging all scuppers and drains
B.placing floating booms around the ship
C.regularly emptying all drip pans
D.thoroughly draining all bunkering hoses
A.wash down the area immediately with a fire hose
B.wash down the area with kerosene
C.cover the area with absorbent material
D.cover the area with foam
A.transmitting the heat of a fire through the ship s metal
B.burning liquids flowing into another space
C.heated gases flowing through ventilation systems
D.the transfer of heat across an unobstructed space
最新試題
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The shipboard oil pollution emergency plan will be invalid after ()
Under MARPOL Code the ship to which it applies has to carry ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()