A.spilling
B.leaking
C.dumping
D.All of the above
您可能感興趣的試卷
你可能感興趣的試題
A.remove combustibiles from direct exposure
B.cool the bulkhead around the fire
C.close all openings to the area
D.shut off electrical power
A.is properly vented
B.contains no explosive fumes
C.has no oil in the bilges
D.all of the above
A.an electrical switchboard
B.the pressure tanks
C.the fuel oil tanks
D.the oily rag bin
A.The garbage to be discharged will sink
B.Garbage accumulation onboard has exceeded storage space
C.A person falls overboard, and a plastic ice chest is thrown for flotation
D.The destination port or terminal cannot receive garbage
A.Engine room bilges
B.Paint locker
C.Battery storage locker
D.Fuel oil tank
最新試題
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Cold weather starting of a diesel engine may be made easier by()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
Which of the following items don’t belong to dock repair works?()
Under MARPOL Code the ship to which it applies has to carry ()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()