A.The pressure-vacuum relief valve should be reset
B.The tanks should be made seaworthy to prevent contamination
C.The tanks should be sounded to make sure the levels are not rising
D.The tanks should be marked with a bull stamp on the manifold filling valve
您可能感興趣的試卷
你可能感興趣的試題
A.hose joints are made up
B.tanks are being topped off
C.system is being lined up
D.pumping operation is first started
A.Reduce the pumping rate by closing the deck filling valve
B.Close all overflow valves
C.Place 5 gallon containers under all flange connections in the fuel line
D.Reduce the pumping rate and sound tanks frequently as the level rises
A.Increased viscosity of the product needs higher loading pressure, which increases the chances of a spill
B.Air pockets may cause the fuel to bubble out of the ullage hole
C.The temperature rise of the fuel will cause an overflow
D.Fueling valve may become stuck closed and cause the fuel oil to spill before the valve can be opened
A.actuate an alarm and open the engine room control valve
B.actuate an alarm and open the engine room CO2 releasing valve
C.open the engine room control valve and shut off engine room ventilation fans
D.open the engine room control valve and then the CO2 releasing valve
A.to the bottom of the expansion trunk
B.to within 1% to 3% of its capacity
C.to within 1% to 3% inches of its capacity
D.1 to 3 inches from top of the vent pipe
最新試題
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
The ISPS Code consists of a mandatory section-Part A, which shows()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Under MARPOL Code the ship to which it applies has to carry ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
() is not installed on the main switchboar.
Diesel engine air start system check valves are opened by ()