A.the vessel has enough room to swing while at anchor
B.the anchor flukes bite into the ocean bottom
C.there is sufficient weight from the anchor and chain to prevent dragging
D.there is more chain out than there is in the chain locker
您可能感興趣的試卷
你可能感興趣的試題
A.mooring line made of spring lay wire rope
B.mooring line running diagonally to the keel
C.mooring line parallel to the keel
D.wire rope used for securing an anchor buoy
A.Spring lay
B.Lang lay
C.Cable lay
D.Alternate lay
A.independent
B.lang lay
C.preformed
D.spring lay
A.clean anchor chain as it's hauled in
B.recover anchors which have lost their buoys
C.run and retrieve anchors
D.prepare anchor chain for inspection
A.can be released while under strain
B.is used for boat falls
C.is used for extra heavy loads
D.is used for light loads only
最新試題
In the stowage of deck cargo,cribbing is().
Mousing a cargo hook with marline or small line().
Progressive flooding is controlled by securing watertight boundaries and().
I’ve already put down the remarks DECK CARGO()SHIPPER’S RISK in the Shipping Order.
The most common method of securing a line to a cleat is a().
To reduce stress on the towing hawser when towing astern (ocean tow),the hawser should be ().
If two mooring lines are to be placed on the same bollard,which method is BEST?().
In order to correctly open a new coil of manila line,you should().
The shippers to load trucks and heavy cargo,and also to supply all necessary materials for lashing.The expenses will be charged to()account.
Placing a lashing across a hook to prevent a fitting from slipping out of the hook is called ().