單項(xiàng)選擇題The SMS should provide for specific measures aimed at promoting the reliability of equipment or systems () may result in hazardous situations.

A.which the sudden operational failure
B.that the sudden operational failure
C.the sudden operational failure
D.the sudden operational failure of which


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題() should not undertake any task which will interfere with the supervision duties relating to the main machinery and associated equipment.

A.The watch keeping personnel
B.The chief engineer
C.The person on a bunker barge
D.The duty deck officer

2.單項(xiàng)選擇題STCW78/95 Convention describes that () are laid down for the certification of engineer officers in charge of a watch in a traditionally manned engine room, or the designated engineer in a periodically unmanned engine room.

A.available minimum requirements
B.available maximum requirements
C.mandatory minimum requirements
D.mandatory maximum requirements

3.單項(xiàng)選擇題In some cases facilities may be provided for emergency overriding oil pressure shutdown, if this facility is used, adequate warning must be given to ().

A.the bridge watch-keeper
B.the captain
C.the chief engineer
D.the engine room staff

4.單項(xiàng)選擇題At an unsheltered anchorage the chief engineer officer shall consult with () whether or not to maintain an underway watch.

A.the engineer officer in charge of watch
B.the deck officer in charge of watch
C.the master
D.the chief mate

5.單項(xiàng)選擇題The Oil Record Book, as a part of the ships official logbook, shall be kept on board and preserved for a period of ().

A.3 years after making the first entry
B.2 years after the last entry
C.3 months after last entry
D.3 years after the last entry

最新試題

Engine parameters shall be corresponded to NOx Technical Files. This is required by ()

題型:?jiǎn)雾?xiàng)選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:?jiǎn)雾?xiàng)選擇題

As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()

題型:?jiǎn)雾?xiàng)選擇題

For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()

題型:?jiǎn)雾?xiàng)選擇題

If two A.C.generators are to be operated in parallel, the load is distributed evenly by()

題型:?jiǎn)雾?xiàng)選擇題

Using a file without a handle may result in ()

題型:?jiǎn)雾?xiàng)選擇題

The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()

題型:?jiǎn)雾?xiàng)選擇題

The cetane rating of diesel fuel is an indication of the ()

題型:?jiǎn)雾?xiàng)選擇題

Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()

題型:?jiǎn)雾?xiàng)選擇題

Flame failure in an automatically fired auxiliary boiler can from a/an ()

題型:?jiǎn)雾?xiàng)選擇題