A.the master
B.the chief engineer
C.the officer on duty
D.the engineer in charge of watch
您可能感興趣的試卷
你可能感興趣的試題
A.which the sudden operational failure
B.that the sudden operational failure
C.the sudden operational failure
D.the sudden operational failure of which
A.The watch keeping personnel
B.The chief engineer
C.The person on a bunker barge
D.The duty deck officer
A.available minimum requirements
B.available maximum requirements
C.mandatory minimum requirements
D.mandatory maximum requirements
A.the bridge watch-keeper
B.the captain
C.the chief engineer
D.the engine room staff
A.the engineer officer in charge of watch
B.the deck officer in charge of watch
C.the master
D.the chief mate
最新試題
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The ISPS Code consists of a mandatory section-Part A, which shows()
The shipboard oil pollution emergency plan will be invalid after ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The condensers located in various stages of a flash evaporator are cooled by()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
To proceed to the assistance of a ship in distress is()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()