A.pump
B.engine
C.turbine
D.boiler
您可能感興趣的試卷
你可能感興趣的試題
A.lubricating oil
B.lubricating oil systems
C.strainers
D.cartridges
A.installations
B.basket strainers
C.a cylindrical container
D.a metal or wire basket
A.dampers
B.filters
C.stopper circuits
D.separators
A.check valve
B.non-return valve
C.steam trap
D.quick closing trap
A.stop valves
B.non-return valves
C.quick closing valves
D.relief valves
最新試題
The shipboard oil pollution emergency plan will be invalid after ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
The ISPS Code consists of a mandatory section-Part A, which shows()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
The treatment of the fuel oils involves storage, heating, filtering and()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()