A.telescopic pipe
B.large bore pipe
C.generating pipe
D.central pipe
您可能感興趣的試卷
你可能感興趣的試題
A.flat surface
B.mirror finish
C.sloping surface
D.inclined surface
A.upwards;top
B.upwards;bottom
C.downwards;top
D.downwards;bottom
A.accelerates;decelerates
B.accelerates;accelerates
C.decelerates;decelerates
D.decelerates;accelerates
A.up and down;reciprocating
B.up and down;rotating
C.back and forth;reciprocating
D.back and forth;rotating
A.rotary;reciprocating
B.up and down;fore and aft
C.fore and aft;up and down
D.up and down;rotary
最新試題
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
The ISPS Code consists of a mandatory section-Part A, which shows()
To proceed to the assistance of a ship in distress is()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
If separating effect is not good, which measure should be taken ()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()