A.The large-tension mooring
B.The small-tension mooring
C.The variable-tension mooring
D.The constant-tension mooring
您可能感興趣的試卷
你可能感興趣的試題
A.physical deformation
B.state exchange
C.chemical reaction
D.coalescence
A.seating
B.bedplate
C.entablature
D.cylinder block
A.through bolts
B.jack bolts
C.holding down bolts
D.tap bolts
A.in which
B.on which
C.to which
D.by which
A.there is a minor emergency
B.there is an actual emergency
C.there were a minor emergency
D.there were an actual emergency
最新試題
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Cold weather starting of a diesel engine may be made easier by()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The ISPS Code consists of a mandatory section-Part A, which shows()