A.approved by the Coast Guard
B.high carbon steel
C.fixed with a ferrous cover
D.nonsparking
您可能感興趣的試卷
你可能感興趣的試題
A.the forced ventilating system is operating
B.the cargo pumps are secured
C.no monocarbon gases are present
D.the oily water separator is de-energized
A.signaling that all personnel are clear before lifting or lowering material
B.Examining material for sharp edges or protruding points before handling
C.Closing, tagging, or securing valves that permit entrance of steam, water, or air into a fitting or other equipment
D.Throwing materials from high places to the deck
A.The expansion tank should be topped off
B.The thermostatic water regulating valves should be manually opened
C.The fuel filters should be changed
D.The engine should be turned over slowly with the indicator cocks open
A.Full Ahead
B.Half Ahead
C.Full Astern
D.Half Astern
A.overheating of the lube oil
B.over-speeding of the motor
C.wear on the braking system
D.damage to the teeth
最新試題
The ISPS Code consists of a mandatory section-Part A, which shows()
Under MARPOL Code the ship to which it applies has to carry ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Diesel engine air start system check valves are opened by ()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
The condensers located in various stages of a flash evaporator are cooled by()
The treatment of the fuel oils involves storage, heating, filtering and()
The shipboard oil pollution emergency plan will be invalid after ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()