A.bunker at a normal rate
B.check for kinks in hose
C.close valves slowly
D.shut valves before topping off
您可能感興趣的試卷
你可能感興趣的試題
A.lining up the systems
B.topping off
C.starting delivery
D.connecting hoses and joints
A.draft of the vessel
B.rate of delivery
C.communication with terminal personnel
D.observation of manifold valves
A.be safe if mixed with fresh water
B.prevent seasickness
C.promote urine excretion
D.protect against heat cramps
A.survivors in the water
B.food and water
C.land
D.bad weather
A.12 to 15 times per minute
B.18 to 20 times per minute
C.20 to 25 times per minute
D.as fast as possible
最新試題
The cetane rating of diesel fuel is an indication of the ()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The treatment of the fuel oils involves storage, heating, filtering and()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Which of the following items don’t belong to dock repair works?()
To proceed to the assistance of a ship in distress is()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()