A.the ISM Code
B.the ISPS Code
C.the IBC Code
D.the IGC Code
您可能感興趣的試卷
你可能感興趣的試題
A.English, French or Spanish
B.Chinese, English or French
C.English, French or Japanese
D.Chinese, English or Spanish
A.six months
B.two years
C.four years
D.five years
A.the chief engineer officer
B.the master of the ship
C.the manager of the company
D.the Administration
A.bridge log
B.Master’s log
C.engine room log
D.oil record book
A.local port authority
B.Corps of Engineers
C.USCoast Guard
D.state pollution board
最新試題
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
Flame failure in an automatically fired auxiliary boiler can from a/an ()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The treatment of the fuel oils involves storage, heating, filtering and()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Under MARPOL Code the ship to which it applies has to carry ()
Using a file without a handle may result in ()
Which of the following items don’t belong to dock repair works?()