A.so as to never be integral lube
B.with a sloped bottom
C.only of nonferrous, noncorrosive metals
D.with drain/return lines terminating just above or at the designed normal level
您可能感興趣的試卷
你可能感興趣的試題
A.is an indication of the amount of noncombustible material present in the oil
B.indicates the quantity of energy released by burning a unit amount of the fuel
C.is useful for determining proper atomization temperatures
D.reflects the overall thermal efficiency of the fuel oil service system
A.point of opening
B.speed of opening
C.lift from its seat
D.all of the above
A.Steel brush
B.Fine emery cloth or steel wool
C.A section of the removed compression ring
D.A case hardened scraper
A.improper adjustments
B.contaminated fuel
C.coated fuel lines
D.excessive vibration
A.during low loads
B.after proper oil viscosity is reached
C.during starting
D.after cleaning filters
最新試題
() is not installed on the main switchboar.
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Under MARPOL Code the ship to which it applies has to carry ()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
If separating effect is not good, which measure should be taken ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()