A.seal water supply be cut off
B.make-up water supply be cut off
C.oil outlet valve closed or not open sufficiently
D.the flow rate of oil is too much
您可能感興趣的試卷
你可能感興趣的試題
A.2
B.4
C.5
D.6
A.activate the driers
B.change color
C.secure the compressor
D.add a predetermined amount of liquid drier
A.stopping the main engine suddenly
B.changing the main engine running direction suddenly
C.the sailing from the shallow water area to the deep water area
D.the ship’s trim too much
A.over heat
B.over speed
C.over pressure
D.over worn
A.increasing the linear velocity of the exhaust gases
B.changing directions of exhaust gas flow
C.decreasing the temperature of the exhaust gases
D.accelerating the exhaust gas through a reduced size orifice
最新試題
The shipboard oil pollution emergency plan will be invalid after ()
The ISPS Code consists of a mandatory section-Part A, which shows()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
() is not installed on the main switchboar.
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
The condensers located in various stages of a flash evaporator are cooled by()
Which of the following items don’t belong to dock repair works?()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.