A.ISM Code
B.ISPS Code
C.FSS Code
D.IBC Code
您可能感興趣的試卷
你可能感興趣的試題
A.5
B.3
C.2
D.1
A.inform the captain for a further consideration, then perform it
B.inform the captain, and not perform it
C.stop the M/E immediately, and then inform the chief engineer
D.stop the M/E immediately, and then inform the captain
A.ISM code
B.ISPS code
C.IBC code
D.FSS code
A.the chief engineer officer
B.the master of the ship
C.the manager of the company
D.the Administration
A.SOLAS
B.MARPOL
C.STCW
D.Ballast Water convention
最新試題
Flame failure in an automatically fired auxiliary boiler can from a/an ()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
The ISPS Code consists of a mandatory section-Part A, which shows()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
Cold weather starting of a diesel engine may be made easier by()
The main purpose of port State control is not to()