A.a curve of minimum operational metacentric height(GM)versus draught
B.instructions concerning the operation of cross-flooding arrangements
C.the signals or lights being exhibited or sounded
D.all other data and aids which might be necessary to maintain stability after damage
您可能感興趣的試卷
你可能感興趣的試題
A.Certificate of Inspection
B.American Bureau of Shipping Classification Certificate
C.International Convention for the Safety of Life at Sea Certificate
D.Certificate of Registry
A.COLREGS
B.MMS Rules
C.SOLAS Convention
D.Coast Pilot
A.12 months
B.24 months
C.48 months
D.60 months
A.American Bureau of Shipping classification rules
B.International Regulations for Preventing Collisions at Sea
C.Safety of Life at Sea Convention
D.Minerals Management Service rules
A.hot work permit
B.Certificate of Inspection
C.Safety of Life at Sea Certificate
D.station bill
最新試題
Temporary Certificates of Inspection are effective until the().
What equipment is customarily used when seamen are working on a stage rigged over the side of a vessel().
The Vessel is a()bulk carrier which is permitted to carry grain in bulk without requiring any fittings under the Rules of the 1974 International Safety of Life at Sea Convention.
When two lines are spliced together,().
When attempting to free an anchor jammed in the hawsepipe,the simplest method of freeing it may be().
The best method of protecting that portion of a fiber anchor line nearest the anchor from chafing on the bottom is by().
What is an advantage of having wire rope with a fiber core over that of a wire rope of the same size with a wire core().
The Charterers shall have the privilege to ship dangerous cargo in accordance with()Code or any competent authorities’ regulations,as applicable.
What are the two main types of stud link chain().
In the manufacture of wire rope,if the wires are shaped to conform to the curvature of the finished rope before they are laid up,the rope is called().