單項(xiàng)選擇題When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()

A.Draft and trim
B.Limits of the bending moments
C.Rate of discharging
D.Rate of loading


您可能感興趣的試卷

最新試題

Oil may NOT be transferred unless().

題型:單項(xiàng)選擇題

For the purpose of()tank or hold washings from any vessel,an application shall be made to Harbor Authorities for approval.

題型:單項(xiàng)選擇題

Existing crude oil tankers may,()being provided with segregated ballast tanks or operating with a cargo tank cleaning procedure using crude oil washing,operate with dedicated clean ballast tanks in accordance with the specified provision of the Regulation.

題型:單項(xiàng)選擇題

Gasoline fuel tank vents should terminate().

題型:單項(xiàng)選擇題

Every oil tanker operating with dedicated clean ballast tanks shall be()with a Dedicated Clean Ballast Tank Operation Manual detailing the system and specifying operational procedures.

題型:單項(xiàng)選擇題

Of the following,the most important consideration for a tanker is().

題型:單項(xiàng)選擇題

If you are bunkering and you close off one tank in the line of tanks being filled,the rate of flow to other open tanks on the same line will().

題型:單項(xiàng)選擇題

On the all-purpose nozzle,the position of the valve when the handle is all the way forward is().

題型:單項(xiàng)選擇題

Notwithstanding the provisions of this Regulation,the segregated ballast conditions for oil tankers less than 150 meters in length shall be to the()of the Administration.

題型:單項(xiàng)選擇題

Functions aboard a tanker or tank barge such as connecting,disconnecting,and topping off must be supervised by().

題型:單項(xiàng)選擇題