A.excessive purging before lighting off
B.insufficient trail for ignition period
C.a faulty transformer in the ignition circuit
D.insufficient purging before lighting off
您可能感興趣的試卷
你可能感興趣的試題
A.prevent engine back pressure at heavy loads
B.increase total engine efficiency at low loads
C.prevent boiler corrosion at low engine loads
D.improve engine fuel consumption at any load
A.steam demand is high
B.salinity is high
C.safety valve simmers
D.burner flame is extinguished
A.incorrect electrode setting
B.incorrect nozzle position
C.clogged fuel nozzle
D.broken high tension lead
A.relight the boiler immediately to prevent loss of steam pressure
B.relight the fire off the brickwork as the bricks are cherry red
C.purge the furnace of any combustible gases before attempting to relight the fire
D.speed up the feed pump to prevent dry firing when the burner flame is reestablished
A.in the event of a flame failure
B.in the event of a stack fire
C.when the water level reach the crown sheet
D.when the feed pump discharge pressure drops to a preset minimum
最新試題
The cetane rating of diesel fuel is an indication of the ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Cold weather starting of a diesel engine may be made easier by()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
Diesel engine air start system check valves are opened by ()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()