單項選擇題Please arrange for the workers to do the()work during loading the trucks and heavy cargo on the ship,and also supply the necessary materials for the work.

A.lashing
B.shifting
C.lifting
D.tallying


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題Please()that my ship is ready in every respect to load her cargo.

A.advised
B.to be advised
C.be advised
D.are advised

2.單項選擇題Please()a cleaning gang to sweep out the hold.

A.arrange for
B.to arrange
C.arrange to

3.單項選擇題Planning to stow()in the end lower holds will result in much broken stowage.

A.large crates or cases
B.small curved items
C.drums
D.filler cargo

4.單項選擇題Navigational marks used for informational or regulatory purposes are().

A.solid yellow
B.white with orange geometric shapes
C.red and white vertically-striped
D.green and red horizontally-banded

5.單項選擇題Most totally enclosed lifeboats are equipped with which of the following? ()

A.Tanks for the storage of drinking water
B.Ballast tanks to prevent the boat from capsizing
C.A hydraulic start diesel engine
D.Auxiliary mechanical propulsion (Fleming gear)