A.Guy failures
B.Topping lift failures
C.Bending of the boom from compression
D.Gooseneck failure
您可能感興趣的試卷
你可能感興趣的試題
A.is capable of bringing
B.is sufficient to bring
C.is not capable of bringing
D.is probally to bring
A.ships arrive at random
B.cargo-handling time varies greatly
C.ships have to queue to get onto berths
D.ships do not have to wait to get onto berths
A.breakdown
B.breaked down
C.broken down
D.broke down
A.decelerating when lowering the load
B.decelerating when raising the load
C.lowering the load at constant speed
D.raising the load at constant speed
A.at
B.on
C.about
D.after
最新試題
Draft readings shall be considered as()in the draft survey report.
Which statement is TRUE concerning the gooseneck().
Please tell your tallymen to()out the marks in the holds during discharging.
The man directing and supervising the work of stevedores is the().
What type of liquid is used in the liquid P/V breaker().
The cargo,when(),should be completely covered with plastic.
Foreman,the ship(),please get the stevedores to fill the port wings with heavier packages.
The stevedores have already stowed the porcelain ware()up to the deckhead.
Therefore you are requested to arrange()for the above mentioned amount of additional cargo to be loaded on board.
The cargo fall over the dock is called the().