A.bulkwark
B.deck line
C.gunwale bar
D.sheer strake
您可能感興趣的試卷
你可能感興趣的試題
A.bow stem
B.stern
C.portside
D.starboard side
A.after torque causes line pull to exceed the rated capacity of the winch
B.before the line pull reaches the rated capacity of the winch
C.when the line pull reaches the breaking strength of the fall
D.before the safe working load of the fall is reached
A.install shoring so the shoring supports the damaged bulkheads without pushing on them
B.install shoring so that it pushes on the damaged bulkhead while supporting it
C.use jacks or chain falls to remove the set before installing shores
D.place sandbags by the bulkhead without installing shores
A.triangular-shaped plates connecting the bull chain to the topping lift
B.metal plates secured over the tops of the hawsepipes
C.faired shell plates with curvature in two directions
D.sheets of dunnage used to prevent heavy cargo from buckling the deck plates
A.assist in drydock alignment
B.improve the vessel's stability
C.protect the vessel from slamming against piers
D.reduce the rolling of the vessel
最新試題
The Tonnage Certificate indicates().
The joint of the riser in a marine riser system that compensates for heave,the up-and-down motion of a floater,is the().
The perforated,elevated bottom of the chain locker,which prevents the chains from touching the main locker bottom and allows seepage water to flow to the drains,is called a().
The platform that supports the derrickman when tripping pipe is called the().
In vessel construction,a greater number of watertight bulkheads results in().
Prior to magnetic particle inspection of anchor chain,the chain should be().
Freeboard is measured from the upper edge of the().
Regulations require that access to a cargo pumproom in a tanker carrying grade D liquid cargo,shall be().
Shell plating is().
The athwartship hull structural members of a ship are().