A.save network cost
B.improve the reliability of supplying power to important load
C.prevent sequence reverse
D.increase the power factor of important load
您可能感興趣的試卷
你可能感興趣的試題
A.Ammeter and changeover switch
B.Power factor meter
C.Synchroscope
D.Reverse sequence relay
A.Control panel
B.Load panel
C.Paralleling panel
D.Busbar
A.Busbar
B.Load panel of main generator
C.Paralleling panel
D.Shore connection box
A.Control panel of main generator
B.Control panel of emergency generator
C.Paralleling panel
D.Load panel of main generator
A.Suez Canal searchlight, air compressor and air conditioning compressor
B.Air compressor, boiler blower and refrigeration plant
C.Boiler blower, Suez Canal searchlight and refrigeration plant
D.Suez canal searchlight, air compressor and boiler blower
最新試題
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
To proceed to the assistance of a ship in distress is()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Diesel engine air start system check valves are opened by ()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The shipboard oil pollution emergency plan will be invalid after ()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
The condensers located in various stages of a flash evaporator are cooled by()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()