A.releasing the boiler water
B.the explosion detecting and cleaning for the fuel tank
C.the docking project related item
D.shore power and fire fighting water supply
您可能感興趣的試卷
你可能感興趣的試題
A.igniting boiler
B.releasing air in sea water system
C.starting generator
D.cut off shore power
A.the sinking of tail shaft
B.the clearance of stern bearing
C.the total flexure of both end bearing
D.main engine crankshaft deflection
A.the repair standard of main docking repair item
B.the special tool for repair item
C.the skill of repairer
D.the status of docking repair equipment
A.making the repair list, booking spare parts and special tools for the dock repair
B.shutting off all of the SW valves to outboard
C.the sketches or diagrams used for the dock repair
D.cleaning up the oil tank and boiler before enter the dock
A.the SW outboard valves
B.the tailshaft LO stop valve
C.the drain valve of the boiler
D.propeller shaft sealing device
最新試題
Using a file without a handle may result in ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
The treatment of the fuel oils involves storage, heating, filtering and()
The shipboard oil pollution emergency plan will be invalid after ()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Under MARPOL Code the ship to which it applies has to carry ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Flame failure in an automatically fired auxiliary boiler can from a/an ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()