A.Running rigging leading aft from the masts
B.Running rigging leading forward from the masts
C.Standing rigging leading aft from the masts
D.Standing rigging from the cross trees to the mast head
您可能感興趣的試卷
你可能感興趣的試題
A.Cleanly/during
B.Clear/meanwhile
C.Clean/between
D.Clean/prior to
A.slipway
B.graving dock
C.ground warp
D.caisson dock
A.Hydraulic drive systems
B.Electric drive systems
C.Steam drive systems
D.Man-powered drive systems
A.a master controller or switchbox
B.a group of relays
C.contactors
D.a solenoid brake
A.one meter from the tank bottom and one meter below the tank top
B.one half the ullage of the tank and one meter below the tank top
C.one half the ullage of the tank and one meter above the tank bottom
D.at three meter intervals from the tank top
最新試題
How should you signal the crane operator to move slowly().
Which statement is FALSE concerning a tagline as used with a 30-ton pedestal crane().
Which method should be used to warm up the pump turbines prior to discharge().
Most pedestal crane power is provided by().
What does “evel-luffing” accomplish during crane operations().
Sudden starts or stops of the boom is likely to cause all of the following except().
When viewed from above,the best position for the guy in relation to the boom is().
Which statement is TRUE concerning the placard entitled Discharge of Oil Prohibited().
What is the purpose of the equalizing beam aboard a crane vessel().
How should you signal the crane operator to hoist().