A.It prevents the load from swinging when the boom level is adjusted
B.Less power is needed when topping the boom with a load on the hook
C.It maintains the height of the load above the deck
D.All of the above
您可能感興趣的試卷
你可能感興趣的試題
A.started
B.finished
C.completed
D.reported
A.Cranes/derricks
B.Crane/derrick cycles
C.Crane/derrick cycle time
D.Weight per package
A.Date and description of each failure
B.Average load in pounds for each usage
C.Total number of lifts for each usage
D.All of the above
A.less jerky starts
B.less jerky stops
C.overheating worries
D.none of the overheating worries
A.breaking a cargo runner
B.parting guys topping lifts
C.carrying away a block
D.overheating the resistors and eventually burning out
最新試題
The net productivity per gang-hour can be improved through a decrease of().
The Master or person in charge of a ship shall ensure the crane record book shows the().
When using slings,cargo handlers should take all the following precautions except().
Most pedestal crane power is provided by().
How should you signal the crane operator to move slowly().
How should you signal the crane operator to hoist().
Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels().
Which statement comparing a shipboard crane to conventional gear is TRUE().
On no account()to be exceeded.
What is/are the advantage(s)of cranes over conventional cargo booms().