A.prevent an unsafe ship proceeding to sea
B.prevent a ship threatening the marine environment
C.fine the ships
D.confirm a safe sailing
您可能感興趣的試卷
你可能感興趣的試題
A.the master should be immediately informed
B.the master will be prohibited from contacting the Administration or other organization
C.he will carry out the inspection after the master be informed and be ready
D.he will carry out the inspection without informing the master
A.the PSCO’s general impression confirm a good standard of maintenance
B.the certificates are valid
C.the PSCO believes the ship doesn’t meet the requirements
D.the PSCO can’t find deficiencies at first glance
A.Survey Report File
B.Minimum Safe Manning document
C.Certificates of Competency
D.International Oil Pollution Prevention
A.through bolts
B.end chock bolts
C.side chock bolts
D.tap-bolts
A.Routine docking repair
B.Voyage repair
C.Damage repair
D.Conversion
最新試題
Which of the following items don’t belong to dock repair works?()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
() is not installed on the main switchboar.
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
If separating effect is not good, which measure should be taken ()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The treatment of the fuel oils involves storage, heating, filtering and()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()