A.Make three tucks with full strands,remove half the wires from each strand,and make two more tucks
B.Make four tucks in each strand,cut away every other strand,and make two more tucks with each remaining strand
C.Make four tucks with each full strand
D.Make six tucks with each strand,removing a few wires from each strand as each additional tuck is made
您可能感興趣的試卷
你可能感興趣的試題
A.soon or late
B.soon or later
C.sooner or late
D.sooner or later
A.In due course
B.On time
C.In time
D.Swiftly
A.loosely
B.closely
C.heavily
D.strongly
A.unit method
B.block method
C.straight method
D.package method
A.Local agent
B.Watchman
C.Docker
D.Foreman
最新試題
Which cargo is considered volatile().
The Chief Tally would like to inquire()the rotation of the discharging ports.
The Tally Fees will be settled()my Shipowner()the agents.
Therefore you are requested to arrange()for the above mentioned amount of additional cargo to be loaded on board.
Please tell your tallymen to()out the marks in the holds during discharging.
When oil is accidentally discharged into the water,what should you do after reporting the discharge().
The cargo,when(),should be completely covered with plastic.
The cargo fall over the dock is called the().
Please shift some light cargo to fill it().
Draft readings shall be considered as()in the draft survey report.