A.unit method
B.block method
C.straight method
D.package method
您可能感興趣的試卷
你可能感興趣的試題
A.Hydraulic oil
B.Water-antifreeze mixture
C.Distilled water
D.Oil from the cargo
A.Make three tucks with full strands,remove half the wires from each strand,and make two more tucks
B.Make four tucks in each strand,cut away every other strand,and make two more tucks with each remaining strand
C.Make four tucks with each full strand
D.Make six tucks with each strand,removing a few wires from each strand as each additional tuck is made
A.soon or late
B.soon or later
C.sooner or late
D.sooner or later
A.In due course
B.On time
C.In time
D.Swiftly
A.loosely
B.closely
C.heavily
D.strongly
最新試題
Please arrange for the workers to do the()work during loading the trucks and heavy cargo on the ship,and also supply the necessary materials for the work.
When oil is accidentally discharged into the water,what should you do after reporting the discharge().
The stevedores have already stowed the porcelain ware()up to the deckhead.
Please shift some light cargo to fill it().
The Tally Fees will be settled()my Shipowner()the agents.
Red lights may appear on().
The cargo,when(),should be completely covered with plastic.
The Captain of the Port has closed to navigation,and buoyed,a section of a harbor. These buoys would be painted().
The Chief Tally would like to inquire()the rotation of the discharging ports.
We’ll adopt the mechanical tallying method().