單項(xiàng)選擇題In the safety communication,you can get your R/O()it for you.

A.do
B.to do
C.doing
D.done


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題When amendments are made to the Shipboard Oil Pollution Emergency Plan,the revisions must be submitted to the Coast Guard().

A.one month before the anniversary date of the plan
B.six months before the end of the approval period
C.and cannot be implemented without approval
D.and can be implemented without immediate approval as long as final approval is received within six months of submission

2.單項(xiàng)選擇題Which statement concerning Montauk Point Light is TRUE?()

A.The light comes on at sunset
B.There is an emergency light if the main light is extinguished
C.The height of the light is 24 feet
D.The tower is painted with black and white stripes

3.單項(xiàng)選擇題Which shipboard equipment will detect a signal from a SART?()

A.S-Band Radar
B.A DSC receiver
C.X-Band Radar
D.The autoalarm

5.單項(xiàng)選擇題When will the float-free emergency position indicating radio beacon be activated after abandoning ship?()

A.Immediately after floating free
B.After about one hour when the salt water activates the battery
C.Only when keyed by the radar of another vessel
D.Only when daylight activates the photovoltaic cell

6.單項(xiàng)選擇題What is the primary purpose for Digital Selective Calling (DSC)?()

A.DSC provides reception of weather and navigational warnings plus search and rescue information
B.DSC provides low-cost,routine communications for the vessel operator
C.DSC is to be used for transmitting and receiving distress alerts to and from other ships or coast radio stations via radio
D.This aids SAR authorities in tracking a vessel's position by satellite

7.單項(xiàng)選擇題Where must the 0mster or person in charge of a ship record the date of each test of emergency lighting and power systems and the condition and performance of the equipment?()

A.On the Certificate of Inspection
B.On the Muster List ("Station Bill")
C.In the Operations Manual
D.In either the official or unofficial log

8.單項(xiàng)選擇題Which emergency is required to be covered at the required periodic drills on a fishing vessel?()

A.Recovering an individual from the water
B.Steering casualty
C.Emergency towing
D.Loss of propulsion power

9.單項(xiàng)選擇題When should the emergency position-indicating radio beacon be activated after abandoning an OSV?()

A.Immediately
B.After one hour
C.Only when another vessel is in sight
D.Only after sunset

10.單項(xiàng)選擇題Which action(s) should the operator of a pedestal crane take if crane control is lost?()

A.Let go of both control levers and return to neutral position
B.Press the emergency stop
C.Notify the mate on watch
D.All of the above

最新試題

Which channel and mode should be used when initiating a distress alert transmission?()

題型:?jiǎn)雾?xiàng)選擇題

Where must the 0mster or person in charge of a ship record the date of each test of emergency lighting and power systems and the condition and performance of the equipment?()

題型:?jiǎn)雾?xiàng)選擇題

Which equipment is the primary source of generating a locating signal?()

題型:?jiǎn)雾?xiàng)選擇題

Which topic is NOT required to be discussed at the pre-transfer conference?()

題型:?jiǎn)雾?xiàng)選擇題

Which statement pertaining to log keeping is TRUE?()

題型:?jiǎn)雾?xiàng)選擇題

You are the first vessel to arrive at the scene of a distress. Due to the volume of traffic on the radio,you are unable to communicate with the vessel in distress. Which action should you take?()

題型:?jiǎn)雾?xiàng)選擇題

You are on a multiple-product chemical tanker with orders to load diethylamine. What is NOT a requirement for transporting this cargo?()

題型:?jiǎn)雾?xiàng)選擇題

Which action(s) is/are included in crane operations?()

題型:?jiǎn)雾?xiàng)選擇題

Which system may be useful for messages,such as local storm warnings or a shore-to-ship distress alert,for which it is inappropriate to alert all ships in the satellite coverage area?()

題型:?jiǎn)雾?xiàng)選擇題

Which statement about transmitting distress messages by radiotelephone is INCORRECT?()

題型:?jiǎn)雾?xiàng)選擇題