A.upon commencement
B.on completion
C.before ending
D.after beginning
您可能感興趣的試卷
你可能感興趣的試題
A.faying
B.caulking
C.felt or canvas packing
D.red lead
A.master bushing
B.kelly slips
C.kelly bushing
D.rotary bushing
A.make underwater repairs to barges
B.determine if the air in a tank is safe for men
C.enter areas that may contain dangerous fumes or lack oxygen
D.resuscitate an unconscious person
A.make the trip only after obtaining a Permit to Proceed to Another Port for Repair,F(xiàn)orm CG-948
B.get underway as soon as possible
C.hire a tug and pilot instead
D.request an Expiration Certificate if the vessel displays a tendency to sink
A.Illumination by flood lights
B.A quick flashing red light at each lower corner
C.A strobe light visible both up and downstream
D.Fixed amber lights under the extreme outer edges of the traveller
最新試題
The damaged cargo is not allowed to export without().
The “grip” of a joint represents the().
Small hull leaks can be temporarily repaired by().
If the ship sustains such damage that repairs are necessary,the master must put into the nearest port()such repairs can be effected.
Manifest and cargo plan are the two most important shipping papers required for().
Under the Vessel Bridge-to-Bridge Radiotelephone Act,failure of a vessel’s radiotelephone equipment().
We have come on board to check with you on the main items of repairs as stated in the().
The damaged derrick()now.
No claim for constructive total loss based upon the cost of recovery and/or repair of the Vessel shall be recoverable hereunder unless such cost would exceed().
Please have the damage on gangway()as soon as possible for account of the Stevedore Company.