A.better control capabilities
B.less maintenance and repair
C.fewer personnel needed during jacking
D.less preload needed
您可能感興趣的試卷
你可能感興趣的試題
A.incurred
B.happened
C.spent
D.paying out
A.you must visually signal oncoming vessels
B.you must immediately tie up in the nearest port until the radiotelephone is repaired
C.you must anchor until the radiotelephone is repaired
D.the loss of the radiotelephone must be considered in navigating the vessel
A.immediately anchor your vessel and arrange for repairs to the system
B.moor your vessel at the nearest dock available and arrange for repairs to the system
C.arrange for the repair of the system to be completed within 48 hours
D.exercise due diligence to restore the system at the earliest practicable time
A.which
B.at which
C.there
D.at there
A.Change of employment
B.Permit to proceed
C.Application for inspection
D.Temporary Certificate of Inspection
最新試題
Starting motors,generators,and other spark producing devices should be mounted as high above the bilges as possible to().
The damaged derrick()now.
The radio technician will come aboard()the repairs.
Point out which one of the following items is not in the charge of Chief Officer in repairing operation().
Rivets are usually made of().
Records which must be retained on board after report of casualty to a vessel include the().
No claim for constructive total loss based upon the cost of recovery and/or repair of the Vessel shall be recoverable hereunder unless such cost would exceed().
If the Certificate of Inspection of a damaged tank barge has expired,which certificate may be issued to allow its movement to a repair facility?()
Please have the damage on gangway()as soon as possible for account of the Stevedore Company.
The deck control valve to be()after being repaired.