A.auxiliary guys
B.extra fair leads
C.steel bands
D.stops
您可能感興趣的試卷
你可能感興趣的試題
A.be open to view so,if a foreign object gets in the gearing,the operator can immediately stop the machinery
B.have a guard over the gearing
C.be painted a contrasting color from the base color in order to call attention to the gearing
D.not be operated if there is any crew within 10 feet of the machinery
A.conspicuously marked
B.stowed anywhere
C.left on deck
D.secured or stowed out of the way
A.coiling
B.faking
C.flemishing
D.lining
A.reduce the water pressure on the hull
B.reduce the water leaking around the plugs
C.prevent progressive flooding
D.reduce the possibility of stress fractures
A.lower most continuous deck not broken by water tight bulkheads
B.after most weather deck above the main strength deck
C.upper or weather deck above the main strength deck
D.deck of light construction below the main or strength deck
最新試題
Solid waste generation,and electricity and water consumption are costly and have their own set of environmental().
The margin plate is the().
What()to him is whether the job of a deck officer allows him to pursue his studies.
The purpose of the tripping line on a sea anchor is to().
You must ensure that lifesaving equipment is().
What is TRUE about hoisting operations?()
The vessel or other goods upon which the Works have been carried out must be()from the Repairer’s worksite within 3 days after the invoice date or in accordance with other written notification by the Repairer to the Customer.
The usual method of arranging a line on deck so that it will run out easily without kinking or fouling is().
The margin plate is the().
The Customer agrees to pay the full invoiced price,plus all other amounts payable to the()Repairer under these terms and conditions,relating to or arising out of the Works for the Customer.