單項選擇題In ship operations,hoisting and lowering pipe in and out of the drilled hole is the main function of the().

A.swivel
B.cathead spool
C.drawworks
D.stand pipe


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題In ship construction,keel scantlings should be the greatest().

A.at each frame
B.amidships
C.one-third the distance from the bow
D.one-third the distance from the stern

2.單項選擇題In ship construction,frame spacing is().

A.greater at the bow and stern
B.reduced at the bow and stern
C.uniform over the length of the vessel
D.uniform over the length of the vessel,with the exception of the machinery spaces,where it is reduced due to increased stresses

3.單項選擇題In relation to cargo gear,what does SWL mean?().

A.Safe working load
B.Ship's working lift
C.Starboard wing lift
D.Stress,weight,load

4.單項選擇題In nautical terminology a dog is a().

A.crow bar
B.device to force a water tight door against the frame
C.heavy steel beam
D.wedge

5.單項選擇題If the engine of a survival craft does not start,check to see().

A.that the fuel valve is open
B.if the air supply system is open
C.if the water sprinkler system is open
D.if the limit switch is on