A.is a deck fitting used to shackle gear to the deck
B.permits easy jettisoning of deck cargo in an emergency
C.prevents stress concentration in the bulwark
D.provides openings through the bulwark for mooring lines
您可能感興趣的試卷
你可能感興趣的試題
A.must be wet before it will release
B.should be kept in a watertight cover except in an emergency
C.will inflate the raft in its cradle if operated manually
D.must be submerged to a certain depth to release automatically
A.Escape route
B.Alley way
C.Corridor
D.Embarking way
最新試題
A tackle is two blocked when the blocks are().
The equipment required to remove an on-deck oil spill on a barge transfering oil must either be arried on board or().
It is permissible to place an eye splice in wire rope used as cargo gear providing the splice is made using().
A spring line leads().
Deck foam systems,designed to protect cargo areas on tankers built after January 1,1975,must have a supply of foam-producing material to operate the system at its designed rate of foam production for().
Cable tension for catenary calculations is taken at the().
As you hold a piece of manila line vertically in front of you,the strands run from the lower left to the upper right. Which type of line is this?()
If you were to pass a stopper on a wire rope,what should the stopper be made of?()
The canopy of an inflatable liferaft should().
A stopper is().