A.Bunkering barge alongside
B.Potable water spill on deck
C.Crane hydraulic hose bursts
D.Trim greater than 4 feet
您可能感興趣的試卷
你可能感興趣的試題
A.Bunkering
B.High winds
C.Potable water spill on deck
A.immediately flush the spill with large quantities of fresh water
B.cover the contaminated surface with soda-ash-soaked lime solution
C.add sodium bisulfate on the contaminated surface and spray it down with water
D.move to a position upwind of the spill and allow the product to boil off
A.stronger than during the summer months
B.weaker than during the summer months
C.drier than during the summer months
D.wetter than during the summer months
A.north and increasing
B.north and decreasing
C.south and increasing
D.south and decreasing
A.opposite direction from which the fibers are twisted together to form strands
B.same direction the fibers are twisted to form strands
C.opposite direction from which the fibers are twisted together to form the line
D.opposite direction from which the fibers are twisted together forming cables
最新試題
Each drilling unit equipped with helicopter fuel storage tanks must have the tanks installed as far as practicable from the().
During which condition should the operator of a pedestal crane shutdown operations?()
Fire protection regulations for towing vessels require any fuel line subject to internal head pressure from fuel in the tank to().
Each fire pump on a tanker must have a pressure gauge located at().
During oil transfer operations,who is responsible for ensuring that the posted transfer procedures are followed?()
During the day,a dredge will indicate the side on which it is safe to pass by displaying().
Fire may be spread by which means?()
Fire extinguishers used on ship’s are numbered by size I through V,with I being().
Each EPIRB required on an OSV shall be tested using the integrated test circuit and output indicator every().
During which condition should the operator of a pedestal crane shutdown operations?()