A.maximum sustained vertical load an anchor will resist before dragging
B.maximum sustained horizontal load an anchor will resist before dragging
C.maximum sustained vertical load an anchor will resist before the mooring line breaks
D.maximum sustained horizontal load an anchor will resist before the mooring line breaks
您可能感興趣的試卷
你可能感興趣的試題
A.personnel line
B.whip line
C.main hoist line
D.pendant
A.gooseneck
B.step
C.swivel
D.pintle
A.factory pallet
B.shipping pallet
C.stevedoring pallet
D.warehouse pallet
A.top or upstream beginning of a bend
B.bottom or downstream beginning of a bend
C.midpoint or center radius of a bend
D.center line or apex of a bend
A.This is the best place to land
B.You are seen - assistance will be given as soon as possible
C.Tail block is made fast
D.Slack away
最新試題
The hoist line primarily used for lifting personnel on ship cranes is called the().
In all but the most severe cases,bleeding from a wound should be controlled by().
In order to detect rot in manila lines,you should().
The Master to prosecute all voyages with the utmost()and to render customary assistance with the Vessel’s Crew.
Under the forces of its own weight,the suspended length of line will fall into a shape known as a().
When evacuating a seaman by helicopter lift,which statement is TRUE?()
It was demanded that the injured crewmembers()at once.
The hinge fitting used to attach the boom to the mast is the().
The Coordinator Surface Search in a SAR situation should display by day().
What is the lifesaving signal for,You are seen - assistance will be given as soon as possible?()