A.ship surveyor's report
B.a ship's certificate
C.a cargo inspection report
D.a dive survey report
您可能感興趣的試卷
你可能感興趣的試題
A.order list
B.repair list
C.srore list
D.spare parts list
A.the ship type
B.the port's organization
C.the cargo's nature
D.the docker's ability
A.at
B.to
C.for
D.in
A.The fioot/tons needed to trim the vessel by 1 inch
B.The foot/tons needed to trim the vessel by 1 foot
C.The moments needed to trim the vessel by 1 centimeter
D.The amount of vessel will trim when loading 100 tons 100 feet from the tipping center
A.The amount of buoyancy measured in foot/tons
B.The vertical distance above the waterline inside the hull
C.The volune of space that is filled with water
D.The volume of intact space above the waterline
最新試題
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
Before any loading takes place any signs of the previous cargo should do().
()is the act of allocating space to containers on board of a container ship in the order of the discharge ports.
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.
Which of the following is not a form of precipitation?()
According to the relevant regulation, lifeboat should be powered by().
The ISM code is part of().
It is dangerous for vessels without the operational radar()the estuary.
The company should establish and maintain procedures to control all documents and date which are relevant to().
Fog is likely to occur when there is little difference between the dew point and the().