A.IBC code
B.BC code
C.IMDG code
D.IGC code
您可能感興趣的試卷
你可能感興趣的試題
A.strips of burlap
B.heavy paper
C.dunnage boards
D.strips of rope yarm
A.below
B.in
C.of
D.under
A.ballast deep tanks if they are slack
B.transfer ballast athwarships
C.pump out double bottoms
D.fill double bottom from deep tanks
A.tighted formally
B.shut tightly
C.combined properly
D.closed suitably
A.ship surveyor's report
B.a ship's certificate
C.a cargo inspection report
D.a dive survey report
最新試題
ECDIS must be able to perform all of the following EXCEPT().
Full details of all lights and fog signals are shown on().
It is dangerous for vessels without the operational radar()the estuary.
Your vessel is docking, but not yet alongside. Which line will be the most useful when maneuvering the vessel alongside the pier?().
When the wave period and the apparent rolling period are the same().
A tide is called diurnal when().
Before any loading takes place any signs of the previous cargo should do().
Berthing means bringing a vessel to her berth until().
The helm command PORT TWENTY means().
Which of the following shall not the officers in charge of the navigational watch do?()