A.Cut the painter
B.Operate the radio equipment
C.Open the equipment pack
D.Ventilate the liferaft of CO2
您可能感興趣的試卷
你可能感興趣的試題
A.looking at the gage
B.checking the nameplate data
C.weighing by hand
D.weighing on a properly calibrated scale
A.try to find out where the oil is coming from
B.call the master
C.have the pumpman check the discharge piping
D.shut down operations
A. Wet clothes during the day to decrease perspiration
B.Get plenty of rest
C.Keep the entrance curtains open
D.All of the above
A.No, I have
B.Yes, I haven't
C.Yes, I have
D.No, I didn't
A.damaged
B.damage
C.damaging
最新試題
The loading of the ship must be done in accordance with().
The ISM code is part of().
()is on the panel of radar.
Berthing means bringing a vessel to her berth until().
Before any loading takes place any signs of the previous cargo should do().
()is the act of allocating space to containers on board of a container ship in the order of the discharge ports.
Which of the following shall not the officers in charge of the navigational watch do?()
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
What is it called when it is possible to ignite the vapour above the oil?()
Manoeuvring information can not be obtained from().